Because fc are coordinated with unified dod technical requirements, they form an element of the dod ufc system applicable to specific facility types. The dor must obtain site and building data and investigate existing site conditions, utilities, and facilities to properly integrate the design of the project with existing conditions. Design naval shore facilities in accordance with all navy and department of defense (dod) criteria.

This fc provides specific guidance on how and when to provide a project design deliverable for navfac. This document is organized into design deliverables and design phases. This fc provides specific guidance on how and when to provide a project design deliverable for navfac. This document is organized into design deliverables and design phases. The designer of record must obtain all site and building data and investigate existing site conditions, utilities, and facilities as necessary to properly integrate the design of the project with existing Ò€¦ The \1\ /1/dor must obtain all site and building data and investigate existing site conditions, utilities, and facilities as necessary to properly integrate the design of the project with existing conditions.

The designer of record must obtain all site and building data and investigate existing site conditions, utilities, and facilities as necessary to properly integrate the design of the project with existing Ò€¦ The \1\ /1/dor must obtain all site and building data and investigate existing site conditions, utilities, and facilities as necessary to properly integrate the design of the project with existing conditions.